inverter
SV EDGE 3.2K
3.2 kW · 24V
The SV EDGE 3.2K steps the EDGE platform up to a 24 V bus and 3.2 kW of continuous output — the right size for a family home running a fridge-freezer, washing machine, lighting and electronics through daily outages.
It speaks directly to lithium BMS systems, exposes adjustable charge parameters for lead-acid banks, takes an external WiFi monitor, and has a generator dry contact so a backup genset starts automatically when the battery runs low.
Pricing on request — reply usually within the hour, Dubai time.
Specifications
- Output
- Pure sine wave · 220/230/240VAC ±5%
- MPPT range
- 30–500VDC
- Peak power
- 6000VA
- Rated power
- 3200W
- Max PV input
- 3000W
- Operating temp
- −10°C–50°C
- Battery voltage
- 24VDC
- Max charge current
- 100A
Fitted right, first time
Professional installation
Site preparation
- Mount indoors or under shade in a dry, ventilated space — keep at least 300 mm clearance on all sides for airflow and service access.
- Fix to a solid masonry wall or rigid frame at eye level; never on plasterboard alone.
- Provision a DC battery breaker or fuse rated ~1.25× the maximum charge/discharge current (100 A), plus a PV string isolator and an AC output breaker.
- Keep battery cable runs short (under 3 m where possible) and use correctly sized lugs — voltage drop on the battery side is the most common cause of nuisance shutdowns.
Safety first
- This is a 24 V battery-bus system — only connect a battery bank of matching nominal voltage.
- PV strings carry lethal DC voltage in daylight. Never connect or disconnect PV connectors under load.
- Torque all terminals to specification and re-check after the first week of operation — thermal cycling loosens DC lugs.
- Installation must be carried out by a qualified electrician in accordance with local wiring regulations.
Commissioning checklist
- Confirm battery voltage, PV string Voc and AC input readings on the display match your meter.
- Verify charge current settings match the battery manufacturer's limits.
- Simulate a grid failure and confirm the transfer to battery is clean under a real load.
- Record serial number and settings — Sole Verde support will ask for both.
Installation sequence
- 1
Mount the unit
Mark the bracket, drill and anchor, then hang and lock the inverter. Confirm it sits plumb and the fans are unobstructed.
- 2
Connect the battery bank
Build the 24 V bank from two SV 12-200 AGM batteries connected in series (or a 24 V lithium pack with BMS comms). Connect through the DC breaker with the breaker open, observing polarity — reverse polarity is the single most damaging installation error.
- 3
Connect the PV array
Up to 3,000 W of PV through the MPPT (30–500 VDC window). Verify string open-circuit voltage with a multimeter before plugging in — it must sit inside the MPPT window at the coldest expected morning.
- 4
Wire the AC side
Land grid/generator input and load output on separate breakers with correct phase, neutral and earth. Bond the chassis earth terminal to the building earth.
- 5
Wire the generator dry contact (optional)
Connect the dry-contact terminals to the generator's remote-start input so the inverter can start it automatically on low battery.
- 6
Power up in sequence
Close battery DC first, then PV, then AC. Set battery type, charge current and output priority in the menu before applying load.
This guide is a professional summary, not a substitute for the installation manual. Sole Verde supports certified installers across the region — ask us to connect you with one in your market.