battery
SV 12-200 AGM
200 Ah · 12V
The SV 12-200 is a sealed VRLA AGM deep-cycle battery: 200 Ah at 12 V, maintenance-free by design, with a 12-year float design life and self-discharge under 3% per month — the dependable choice where budgets favour lead-acid and service visits are rare.
Fully compliant with the EU Battery Directive, it is the standard building block for Sole Verde's 12 V and 24 V systems: one battery behind an SV EDGE 2K, or two in series behind the 24 V EDGE and PRO inverters.
Pricing on request — reply usually within the hour, Dubai time.
Specifications
- Weight
- ≈59.0kg ±5%
- Voltage
- 12V (6 cells)
- Capacity
- 200Ah @20hr-rate (25°C)
- Terminal
- F10(M8) · F16(M8) & L6 optional
- Cycle use
- 14.6–14.8V @25°C
- Design life
- 12 years
- Max discharge
- 2000A (5 sec)
- Float charging
- 13.6–13.8V @25°C
- Self discharge
- <3% monthly @25°C
- Max charging current
- 60A
Fitted right, first time
Professional installation
Site preparation
- Plan the lift and the final position first — each unit weighs ≈59 kg. Use two people or mechanical assistance and a floor or rack rated for the load.
- Install in a clean, dry, ventilated room away from direct sun and living areas; keep ambient below 40 °C for full cycle life.
- Provide a DC breaker or fuse between battery and inverter, sized to the battery's maximum continuous discharge current.
- Allow 20 mm between adjacent batteries for cooling and inspection.
Safety first
- A battery bank cannot be switched off — terminals are always live. Insulate tools and remove metal jewellery when working on it.
- Never mix batteries of different age, capacity or chemistry in one bank.
- Sealed AGM units are maintenance-free — never attempt to open or refill them.
- Keep the bank away from ignition sources and ensure the room has free air exchange.
Commissioning checklist
- Confirm the inverter reads the correct bank voltage and (for lithium) state of charge over BMS comms.
- Run one full charge cycle and verify the charger tapers correctly at the end of absorption.
- Label the bank with install date and configuration for future service.
Installation sequence
- 1
Position and secure
Place batteries on a level, acid-resistant surface. Do not stack sealed batteries directly on top of each other without a rack.
- 2
Configure the bank
For a 24 V inverter, connect exactly two identical batteries in series; parallel additional series pairs for more capacity (up to 3 strings recommended). Use identical cables of equal length for parallel groups so current shares evenly.
- 3
Connect to the inverter
With the DC breaker open, connect positive and negative through the breaker to the inverter battery terminals. Double-check polarity before closing anything.
- 4
Set charge parameters
Program the inverter for AGM: absorption 14.6–14.8 V and float 13.6–13.8 V per 12 V block at 25 °C, charge current within the battery's limit.
- 5
Verify before load
Measure bank voltage at the inverter terminals, confirm it matches the battery display or datasheet, then close the breaker and confirm state of charge reads correctly.
This guide is a professional summary, not a substitute for the installation manual. Sole Verde supports certified installers across the region — ask us to connect you with one in your market.
Engineered together