panel
450W Mono Bifacial
450 W · 53.6V Voc
The 450 W mono bifacial module is the workhorse panel of the line: 156 half-cut monocrystalline cells between two layers of 2.0 mm tempered glass, a construction that shrugs off sandstorms, hail and the humidity swings that delaminate cheaper single-glass panels.
Half-cut architecture keeps output up under partial shading, the genuine MC4-EV02 junction box is IP68-sealed with three bypass diodes, and the bifacial rear face harvests reflected light on raised or light-coloured mounts.
Pricing on request — reply usually within the hour, Dubai time.
Specifications
- Imp
- 9.94A
- Isc
- 10.46A
- Vmp
- 45.28V
- Voc
- 53.58V
- Cells
- 156 half-cut (6×26) mono
- Glass
- 2.0mm / 2.0mm double glass
- Connector
- Genuine MC4-EV02 · IP68 · 3 diodes
- Dimensions
- 2198 × 1005 × 35 mm · 29.0kg
- Efficiency
- 20.4%
- Rated power (Pmax)
- 450W (0~+5W)
- Temp. coefficient Pmax
- −0.354%/°C
Fitted right, first time
Professional installation
Site preparation
- Survey the roof or ground area for shading between 9 am and 3 pm — even partial shade on one module drags down the whole string.
- Use a mounting structure rated for local wind loads, with rails spanning the module's clamping zones only (never clamp outside the marked zones).
- Plan string wiring before lifting panels: with a Voc of 53.6 V per module, strings of up to 9 in series stay inside the 500 VDC limit of the EDGE/PRO inverters — check the cold-morning voltage for your site before finalising.
- To capture bifacial gain, mount at least 0.5 m above light-coloured ground or roof surfaces and avoid rear-side obstructions such as rails running behind the cells.
Safety first
- Modules generate voltage whenever light hits them — treat every connector as live during daylight.
- Work with fall protection on any roof; never carry a module in wind above 30 km/h.
- Do not step on modules or drop tools on the glass — invisible micro-cracks permanently reduce output.
- Earth the mounting structure and module frames per local code.
Commissioning checklist
- Compare string Voc and operating current against the datasheet at similar irradiance.
- Photograph the array and record string layout for the maintenance file.
- Re-torque clamps and check cable dressing after the first month.
Installation sequence
- 1
Install the mounting structure
Fix rails to the roof structure or ground foundation, level and square. On tin roofs seal every penetration; on flat roofs use ballasted or anchored tilt frames at 10–25°.
- 2
Lift and clamp the modules
Each module weighs 29 kg — lift with two people. Clamp within the marked zones, torque clamps evenly, and leave a 10–20 mm gap between modules for thermal expansion.
- 3
String the connectors
Connect MC4 plugs in series along each row, dressing cables under the modules with UV-resistant clips — no cable should rest on the roof surface.
- 4
Run home cables
Route string cables through conduit to the PV isolator at the inverter. Keep positive and negative of the same string together to minimise induction loops.
- 5
Test each string
Measure open-circuit voltage per string (≈53.6 V per module) and confirm polarity before connecting to the inverter.