All products
SV PRO 5500W

inverter

SV PRO 5500W

5.5 kW · 48V

The SV PRO 5500W moves the PRO platform onto the 48 V bus that serious systems are built on. One unit delivers 5.5 kW continuous with an 11,000 VA surge rating; up to nine can be paralleled for 49.5 kW — so the same hardware serves a villa today and a workshop next year.

It takes up to 6,200 W of PV per unit, restarts lithium banks automatically after a protection event, and holds output voltage within ±5% — tight enough for sensitive lab and medical equipment.

Pricing on request — reply usually within the hour, Dubai time.

Specifications

Output
Pure sine wave · 208/220/230/240VAC ±5%
Parallel
Up to 9 units
Dimensions
495 × 312 × 125 mm
MPPT range
60–500VDC
Peak power
11000VA
Rated power
5500W
Max PV input
6200W
Battery voltage
48VDC
Peak efficiency
>94%
Max charge current
100A

Fitted right, first time

Professional installation

Request installation support

Site preparation

  • Mount indoors or under shade in a dry, ventilated space — keep at least 300 mm clearance on all sides for airflow and service access.
  • Fix to a solid masonry wall or rigid frame at eye level; never on plasterboard alone.
  • Provision a DC battery breaker or fuse rated ~1.25× the maximum charge/discharge current (100 A), plus a PV string isolator and an AC output breaker.
  • Keep battery cable runs short (under 3 m where possible) and use correctly sized lugs — voltage drop on the battery side is the most common cause of nuisance shutdowns.

Safety first

  • This is a 48 V battery-bus system — only connect a battery bank of matching nominal voltage.
  • PV strings carry lethal DC voltage in daylight. Never connect or disconnect PV connectors under load.
  • Torque all terminals to specification and re-check after the first week of operation — thermal cycling loosens DC lugs.
  • Installation must be carried out by a qualified electrician in accordance with local wiring regulations.

Commissioning checklist

  • Confirm battery voltage, PV string Voc and AC input readings on the display match your meter.
  • Verify charge current settings match the battery manufacturer's limits.
  • Simulate a grid failure and confirm the transfer to battery is clean under a real load.
  • Record serial number and settings — Sole Verde support will ask for both.

Installation sequence

  1. 1

    Mount the unit

    Mark the bracket, drill and anchor, then hang and lock the inverter. Confirm it sits plumb and the fans are unobstructed.

  2. 2

    Connect the battery bank

    Pair with 51.2 V LiFePO4 storage — one or more Lithium Battery 5KWH or 11.8KWH modules in parallel with BMS communication connected. Connect through the DC breaker with the breaker open, observing polarity — reverse polarity is the single most damaging installation error.

  3. 3

    Connect the PV array

    Up to 6,200 W of PV per unit across the 60–500 VDC MPPT window. Verify string open-circuit voltage with a multimeter before plugging in — it must sit inside the MPPT window at the coldest expected morning.

  4. 4

    Wire the AC side

    Land grid/generator input and load output on separate breakers with correct phase, neutral and earth. Bond the chassis earth terminal to the building earth.

  5. 5

    Parallel configuration (multi-unit systems)

    Install paralleled units side by side with equal-length battery cables, link the parallel communication cables, and set each unit's parallel ID before first power-up.

  6. 6

    Power up in sequence

    Close battery DC first, then PV, then AC. Set battery type, charge current and output priority in the menu before applying load.

This guide is a professional summary, not a substitute for the installation manual. Sole Verde supports certified installers across the region — ask us to connect you with one in your market.

Engineered together

Pairs with